Monthly Archives: March 2011

Vertical Airflow Precooling Doubles Capacity in Same Floor Space

Vertical Airflow Precoolers allow packhouses to double or triple daily throughput, without adding on to the building. The 2-tier forced-air cooling systems, allow packhouse operators to go up, and not out, to increase capacity. Precooling is the term, for quickly … Continue reading

Posted in Ripening | 1 Comment